COILED TUBING COMPLETION Developed to allow operators to continue production from natural-lift oil and gas wells without major workovers.Energy Systems has experienced various applications of coiled tubing, including uses as initial production tubing to replace the jointed pipe, and use as a velocity string in existing completions, being snubbed into an existing well,artificial lift, gas lift, ESP completions and dual concentric strings.
Features and Benefits
◆ Increases savings by reducing the time the drilling rig stays on location.
◆ Minimizes the tubular cost by reducing the hole and casing sizes.
◆ Faster completion than conventional rig and jointed tubing.
◆ Prevent formation damage associated with kill fluids.
◆ Available in all popular API thread and flange connections or combinations of both.
◆ Pressure ratings are comparable to rated pressure of coiled tubing.
ADVANCED SINGLE COMPLETION Developed for applications where production conditions are known or predictable. This concept includes Energy Systems' proprietary elastomer seals designs and our "state of the art" Model 120/130 gate valves.
Features and Benefits
◆ Available up to 15,000 psi wells and completion sizes up to 4 1/16".
◆ Suitable for sour, corrosive environments and when producing in environmentally sensitive areas or in close proximity to the densely inhabited areas (AA to FF).
◆ Production environments include oil, gas, gas lift and all flooding and injection operations when corrosion may be an issue.
◆ Available with or without control-line porting. Multiple ports are available if required.
◆ Certified to API 6A, Appendix F, PR-2 plus additional cycle testing as required by Energy Systems.
DUAL COMPLETIONDeveloped for all multiple tubing string completions. The composite block can be configured where it is best suited for the Operator's well site. Valves can be all front facing or alternate where the long string faces one direction and the short string 180° offset.
Features and Benefits
◆ Available up to 10,000 psi wells and completions sizes up to and including 4 1/16".
◆ Suitable for sweet or sour, corrosive environments.
◆ Production environments include oil, gas, gas lift and all flooding and injection operations.
◆ Available with or without control-line porting. Multiple ports are available if required.
◆ Energy Systems designs for minimal overall height and maximum access. This translates into costs savings and safer operating conditions for the production operators.
◆ Utilizes Energy Systems' proprietary interference and elastomer seals and elastomer seal compound.Is available with metal-to-metal sealing if required.
◆ Available in either a Speedloc®, studded, or flanged connection.
◆ Certified to API 6A, Appendix F, PR-2 plus additional cycle testing as required by Energy Systems.
TUBING-LESS COMPLETION/FRAC FLOW SYSTEMDeveloped for artificial lift applications for Rod Pumps and Progressing Cavity Pumps (PCP). To better serve the artificial-lift market, Energy Systems has added Integral Production BOPs (IPBOP) to our product portfolio. The IPBOP allows the Operator to safely re-enter the well bore by sealing off against the rods or, if the rods are parted, allows one to blind off the well bore.
Features and Benefits
◆ Available up to 2,000 psi wells and completion sizes up and including 4 1/16".
◆ Suitable for sour, corrosive environments and when producing in environmentally sensitive areas or in close proximity to the densely inhabited areas (AA to FF).
◆ Production environment is oil but can be adapted to be suitable if adjacent injection operations create a more corrosive environment.
◆ Although independent components can be provided, the Integral Production BOP (IPBOP) can integrate the tubing head bonnet, production BOP and flow tee, or any combinations of these, in one unit.
◆ The Integrated BOP offers cost savings when compared to purchasing the individual items. In addition,potential leak paths are greatly reduced, and the overall height, which can be 50% less, is safer for Production Operators. ◆ The BOP rams have the capability to seal off from 0 to 11/2" rods.
INTEGRAL PRODUCTION BOP FOR ROD & PROGRESSING CAVITY PUMPSDeveloped to support well fracturing operations in today's natural gas completion processes. In addition, the system works well for applications where high production rates deplete rapidly and a siphon string is to be added at a later date to further enhance production. The smaller tubing head flange allows for economical temporary tubingless completions and for traditional tubing completions. This type of completion eliminates the need for wellhead isolation tools and tree savers during the well fracturing job, saving time and money. The system supports standard jointed tubing or coiled tubing completions.
Features and Benefits
◆ Available up to 15,000 psi wells.
◆ Suitable for sour, corrosive environments and when producing in environmentally sensitive areas or in close proximity to the populous (AA to HH).
◆ Eliminates the need for Wellhead Isolation tools and Tree Savers reducing rental tool cost.
◆ Reduces fracturing stack rental costs because of the smaller size.
◆ Allows a siphon string to be run through the XT, landed, and packed off. The bigger-bore XT can then be removed and replaced with a more economical tree compatible with tubing size and production pressures of the flowing well.
◆ Also available for use with the DTO Wellhead System providing additional drilling time and completion savings.
LARGE - BORE COMPLETIONDeveloped for higher-volume flow rates and applications where erosion due to those flow rates might be an issue. This concept employs Energy Systems' latest technology in metal and elastomer seals and the Model 120/130 gate valve.
Features and Benefits
◆ Available up to 15,000 psi wells and completions sizes up to and including 7 1/16".
◆ Suitable for sour, corrosive environments and when producing in environmentally sensitive areas or in close proximity to the densely inhabited areas (AA to HH).
◆ Production environments include primarily highpressure and high-temperature gas production.
◆ Depending on the component, surface temperature rating can be as high as 450oF.
◆ Available with or without continuous control-line porting. Multiple ports are available if required.
◆ Utilizes Energy Systems' patented metal-tometal sealing technology.
◆ Certified to API 6A, Appendix F, PR-2 plus additional 300 cycles as required by Energy Systems.
TLP / SPAR COMPLETIONDeveloped to provide a dry tree access to a subsea wellbore from a tension leg platform (TLP) and SPAR.
Features and Benefits
◆ Single and dual casing riser design standards for all top tension riser applications.
◆ Available up to 15,000 psi wellhead and completion sizes up to 7 1/16".
◆ Fatigue-resistant length adjustment hangers and riser joints for accurate and fast riser hang off.
◆ High bending moment capacity Speedloc® clamp connections that can handle the rigors of deepwater dry completion units.
◆ Riser load measurement capability that allows simple installation and maintenance.
◆ Compact designs that minimize weight and height for the tight well spacing and riser weight restrictions of deepwater dry completion units.
◆ Use of intermediate pressure rated valves (6,650 psi) for weight savings.
◆ Multiple ports and continuous control lines.
◆ Utilizes Energy Systems' patented metal-tometal seal technology.
◆ Integral design of access platforms allow for safe personnel access in tight space conditions.